spring fed 1000 gallon tank to mobile home to steel building - install question

Users who are viewing this thread

Randy Hefner

New Member
Messages
1
Reaction score
0
Points
1
got 1 HP submersible pump that currently goes 300 feet in 1 inch line to a bladder tank at the mobile home. We need to extend for another 300 feet to a steel building. Should we T off before the mobile home or hook in after the mobile home bladder tank?
 

Valveman

Cary Austin
Staff member
Messages
14,583
Reaction score
1,296
Points
113
Location
Lubbock, Texas
Website
cyclestopvalves.com
I prefer teeing in after the bladder tank. But there is no problem teeing in before the bladder tank as long as you don't have, or at least remove any check valve at the tank.
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks