Sometime in the future - Schluter Ditra with integrated heating mats

Discussion in 'Shower & bathtub Forum & Blog' started by jadnashua, May 22, 2013.

  1. jadnashua

    jadnashua Retired Defense Industry Engineer xxx

    Messages:
    21,896
    Location:
    New England
    At a workshop in the Schluter headquarters...finishing up in the morning. Sometime in the future...no indication of when (product is tested, but not ready for full production/marketing/packaging) they are going to integrate heating in Ditra as an option. Then, if you wanted heated tile, you'd get it all by just installing one sheet! There won't be any further info for probably months as they work out the details, pricing, and get ready to market it for realtime, but it is coming, sometime in the (hopefully near) future. Personally, I expect we'd see it before the end of the year, but then who knows. Their US Kerdiboard factory is nearing max output, and they're going to need to add another production line to produce it to meet the increasing market. We had a chance to work with the stuff over the last few days, and it really is neat. They had built a suspended corner bench with the stuff - Kerdifix the thing to the Kerdiboard walls, tiled above and below with one of their metal trims in front (all metal, polished, matt, or with a tiling recess), they tested it after it had fully cured (Kerdifix cures at about 1/4"/day, and this was a 2" board) and were able to slowly add 12! bags of thinset on it before it collapsed -= that's over 600# (600 + packaging, so not that much over 600#). That from just Kerdifix holding it - think what it could hold if you built a bench with legs!? Schluter has a bunch of videos on YouTube - search on Schluter1 (if I got that right). Really neat.
  2. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,944
    Location:
    North Vancouver, BC
    Post(s) deleted by John Whipple
    Last edited: Mar 15, 2014
  3. jadnashua

    jadnashua Retired Defense Industry Engineer xxx

    Messages:
    21,896
    Location:
    New England
    It's coming, soon, primarily to pass the upcoming (January 2014) commercial steam room perm rating requirements (>=0.5perms is required as of next January in the USA for a commercial steam room). It was mentioned, but no, we did not see any. You may be able to get it if you ask. I haven't looked through the product catalog to see if it's now there. If I get a chance later, I will and edit this if it's in the catalog.
  4. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,944
    Location:
    North Vancouver, BC
    USA Commercial Steam Shower Requirements >= 0.5 perms (Kerdi DS meets this)

    Post(s) deleted by John Whipple
    Last edited: Mar 15, 2014
Similar Threads: Sometime future
Forum Title Date
Shower & bathtub Forum & Blog Bathrooms smell sometimes Jun 27, 2014
Shower & bathtub Forum & Blog Building a Custom Electric Mirror - Sometimes simple is best! Jun 24, 2012
Shower & bathtub Forum & Blog Shower sometimes not hot Feb 23, 2010
Shower & bathtub Forum & Blog Shower not hot in the morning - sometimes May 9, 2007
Shower & bathtub Forum & Blog The Shower of the Future Apr 14, 2014

Share This Page