Shower stall refresh process

Discussion in 'Shower & Bathtub Forum & Blog' started by SAO, Feb 10, 2013.

  1. SAO

    SAO New Member

    Dec 16, 2012
    I am in the process of refreshing my shower stall. I have removed the old shower door and removed the old caulk. I will be having a local glass contractor install a new shower door this week. Should I caulk between the shower base and the tile before I have the new shower door installed, or should I wait until after the door install is complete?
Similar Threads: Shower stall
Forum Title Date
Shower & Bathtub Forum & Blog DIY SHOWER MASTERPIECE: Video Guide for Shower System Installation Aug 14, 2015
Shower & Bathtub Forum & Blog How Do You build the floor in a Curbless Shower Stall? Aug 3, 2015
Shower & Bathtub Forum & Blog Shower glass installation - less than 1/8" gap between U-Channel frame and glass acceptable? Jul 31, 2015
Shower & Bathtub Forum & Blog Can I pull shower pan and reinstall mortar? Apr 28, 2015
Shower & Bathtub Forum & Blog Was this shower drain installed incorrectly? Mar 7, 2015

Share This Page