shower final stages

Discussion in 'Shower & bathtub Forum & Blog' started by FL-DIY, Sep 5, 2005.

  1. FL-DIY

    FL-DIY New Member

    Messages:
    1
    Hello,

    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Messages:
    8,997
    Location:
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see www.johnbridge.com
Similar Threads: shower final
Forum Title Date
Shower & bathtub Forum & Blog ***Kohler Shower Valve replacement ***HELP Thursday at 6:41 AM
Shower & bathtub Forum & Blog New shower difficulty finding good company! Monday at 5:09 PM
Shower & bathtub Forum & Blog Need help identifying shower valve (leaks) Sunday at 5:06 PM
Shower & bathtub Forum & Blog New shower, need help with setup plan? Sep 12, 2014
Shower & bathtub Forum & Blog Leaking AS Press Bal Shower Valve Sep 11, 2014

Share This Page