shower final stages

Discussion in 'Shower & Bathtub Forum & Blog' started by FL-DIY, Sep 5, 2005.

  1. FL-DIY

    FL-DIY New Member

    Sep 5, 2005

    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Aug 31, 2004
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see
  3. Sponsor

    Sponsor Paid Advertisement

Similar Threads: shower final
Forum Title Date
Shower & Bathtub Forum & Blog Squeaky Maxx shower pan...... Yesterday at 1:38 PM
Shower & Bathtub Forum & Blog Need help with Toto vs Hansgrohe Shower fixtures Tuesday at 12:05 PM
Shower & Bathtub Forum & Blog Two questions about Delta shower mixing valve Tuesday at 5:42 AM
Shower & Bathtub Forum & Blog Shower head won't flow Monday at 7:14 PM
Shower & Bathtub Forum & Blog Shower mixing valve and diverter in one Sep 30, 2015

Share This Page