shower final stages

Discussion in 'Shower & Bathtub Forum & Blog' started by FL-DIY, Sep 5, 2005.

  1. FL-DIY

    FL-DIY New Member

    Messages:
    1
    Hello,

    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Messages:
    8,997
    Location:
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see www.johnbridge.com
Similar Threads: shower final
Forum Title Date
Shower & Bathtub Forum & Blog Moen shower temp limiter Today at 11:55 AM
Shower & Bathtub Forum & Blog Preventing Build Up in Shower Corners: Installation Tips for NobleSeal CIS Today at 6:27 AM
Shower & Bathtub Forum & Blog Unique Shower Fixtures: When the everyday is not an option Wednesday at 5:54 AM
Shower & Bathtub Forum & Blog Questions about a newly installed shower stall. Tuesday at 9:46 PM
Shower & Bathtub Forum & Blog Need help identifying this shower valve Monday at 7:33 PM

Share This Page