shower final stages

Discussion in 'Shower & bathtub Forum & Blog' started by FL-DIY, Sep 5, 2005.

  1. FL-DIY

    FL-DIY New Member

    Messages:
    1
    Hello,

    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Messages:
    8,997
    Location:
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see www.johnbridge.com
Similar Threads: shower final
Forum Title Date
Shower & bathtub Forum & Blog 3d marble-look porcelain tiles for shower wall??? Today at 12:22 AM
Shower & bathtub Forum & Blog Shower chair rail cracks after install Yesterday at 8:20 AM
Shower & bathtub Forum & Blog Curved Shower Drains: Installation Photos Sunday at 9:52 AM
Shower & bathtub Forum & Blog Kerdi or NobleDeck: Which is better for a Florida Barrier Free Shower with tree root issues? Friday at 8:11 AM
Shower & bathtub Forum & Blog Tub / Shower Design Question Thursday at 2:19 PM

Share This Page