shower final stages

Discussion in 'Shower & Bathtub Forum & Blog' started by FL-DIY, Sep 5, 2005.

  1. FL-DIY

    FL-DIY New Member

    Messages:
    1
    Hello,

    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Messages:
    8,997
    Location:
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see www.johnbridge.com
Similar Threads: shower final
Forum Title Date
Shower & Bathtub Forum & Blog American Standard Shower Faucet ID / sleeve replacement. Today at 10:48 AM
Shower & Bathtub Forum & Blog Help needed - non standard curbless shower install Yesterday at 12:58 PM
Shower & Bathtub Forum & Blog The hidden dangers of a high shower curb (dam, hob etc) Yesterday at 6:00 AM
Shower & Bathtub Forum & Blog Shower Pan and Enclosure Choices? Please Help Me Choose Tuesday at 1:58 PM
Shower & Bathtub Forum & Blog Delta 600 Series Shower single handle faucet - can anyone ID this mfg? Tuesday at 12:23 PM

Share This Page