    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Aug 31, 2004
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see
  3. Sponsor

    Sponsor Paid Advertisement

Similar Threads: shower final
Forum Title Date
Shower & Bathtub Forum & Blog PEX to shower body questions Sunday at 6:57 PM
Shower & Bathtub Forum & Blog Shower Vapor Barrier Repair Saturday at 8:39 PM
Shower & Bathtub Forum & Blog Advices needed : Toilet and shower drain Friday at 11:28 AM
Shower & Bathtub Forum & Blog Older Grohe shower fauct cap removal Thursday at 2:44 PM
Shower & Bathtub Forum & Blog Shower head riser question Nov 13, 2015

Share This Page