shower final stages

Discussion in 'Shower & Bathtub Forum & Blog' started by FL-DIY, Sep 5, 2005.

  1. FL-DIY

    FL-DIY New Member

    Sep 5, 2005

    I hope I'm in the final stages! I've included a picture as well but, the shower has been completely removed. As you can see it is just the cement foundation and sunken shower floor. I plan to use 1/2 backerboard to cover the walls. They're covered in plastic.

    My question; since it is sunken concrete, can I run the cement backerboard down to the cement floor and then pour the mortar for the floor? Or, it is imperative to have a concrete floor/wall pan?

    Thank you.

    Attached Files:

  2. jimbo

    jimbo Plumber

    Aug 31, 2004
    San Diego
    What is under that cement? You must have a waterproof floor and a plain cement slab is not is. You need a fibreglass pan, or a waterproof membrane ( PVC, copper, or 3 layer hot mop) The waterproofing should extend several inches up the wall.

    For excellent shower pan help, see
  3. Sponsor

    Sponsor Paid Advertisement

Similar Threads: shower final
Forum Title Date
Shower & Bathtub Forum & Blog Shower mixing valve and diverter in one Wednesday at 4:45 PM
Shower & Bathtub Forum & Blog Creating a pan for a single piece stone shower pan Sep 26, 2015
Shower & Bathtub Forum & Blog Strange problem - New Shower Panel Sep 26, 2015
Shower & Bathtub Forum & Blog Twisted off old Delta 600 shower valve. Sep 24, 2015
Shower & Bathtub Forum & Blog Puddled water on shower floor- problem down the road? Sep 20, 2015

Share This Page