Sched 40 pipe 2"

Discussion in 'Plumbing Forum, Professional & DIY Advice' started by syncman, Oct 21, 2012.

  1. syncman

    syncman New Member

    Messages:
    7
    Location:
    Marietta GA
    Spa problem. Cut between 2 PVC fittings to remove a cracked part. No pipe was showing, so I cut between the 2. This means no pipe showing to glue the new fitting. The remaining fitting is a 5 port flange that is not cracked.

    http://www.****.com/itm/2-S-PVC-Manifold-5x-3-4-Ports-Spa-Waterway-672-4400-/261077335685?pt=LH_Defa...

    This is really locked in there. To change that as well would mean re-piping half the tub, plus a lot of insulation stripping. Is there a "repair fitting, coupling, elbow " that would go INSIDE the remnants of the 2" pipe, instead of outside? Maybe a different diameter pipe? A pipe Hog wont work because of all the pipes from another manifold are in the way.
  2. hj

    hj Moderator & Master Plumber Staff Member

    Messages:
    27,058
    Location:
    Cave Creek, Arizona
Similar Threads: Sched pipe
Forum Title Date
Plumbing Forum, Professional & DIY Advice Scheduled Maintenance: June 30th, 2014 Jun 9, 2014
Plumbing Forum, Professional & DIY Advice Gray schedule 40 Apr 5, 2014
Plumbing Forum, Professional & DIY Advice ABS or Sched. 40 PVC? Jun 19, 2013
Plumbing Forum, Professional & DIY Advice Schedule 20 for Tub Drain? Apr 13, 2013
Plumbing Forum, Professional & DIY Advice Schedule 80 Nipples Apr 7, 2013

Share This Page