TedL
New Member
I'm installing a Vikrell tub, and trying to follow the supplied instructions for the optional mortar bed. I have a problem with one step of the instructions, which reads as follows:
"Spread a 2 inch layer of cement or mortar on the subfloor except where the bath feet will be set."
The tub, in the area to be supported, contains appx. 15 pegs in three rows (plus one not in line), which I assume are the "feet" referred to in the instruction. How does one spread a 2" layer and avoid these 15 or 16 loctions? Or, in practice, do you not bother avoiding them?
It also says to put a piece of plastic drop cloth over the mortar before positioning the tub. Is 4 mil plastic too thick?
"Spread a 2 inch layer of cement or mortar on the subfloor except where the bath feet will be set."
The tub, in the area to be supported, contains appx. 15 pegs in three rows (plus one not in line), which I assume are the "feet" referred to in the instruction. How does one spread a 2" layer and avoid these 15 or 16 loctions? Or, in practice, do you not bother avoiding them?
It also says to put a piece of plastic drop cloth over the mortar before positioning the tub. Is 4 mil plastic too thick?