Plumber or bust! I think I can do this! Advice please!

Discussion in 'Plumbing Forum, Professional & DIY Advice, Tips & ' started by petros151, Nov 28, 2011.

  1. petros151

    petros151 New Member

    Messages:
    11
    Location:
    PA
    I'd like to try do DYI on a new kitchen sink and half bath that I've posted about b4

    The #1 issue right now is cutting out some cast and connecting PVC there is old cast all on the horizontal run. I'd rather do the new hook ups to PVC

    The 2nd floor stack I am leaving. it looks good in the chase coming down and it works well
    plus I am not confident I can tear it out and re-do the 2nd floor bath I'm not confident to do that. But the stuff I would connect to PVC is pretty simple I feel I can
    do it after getting advice on how to vent it from the forum experts.

    I would Firnco PVC to Cast and this seems pretty easy. I also understand cutting cast can be tricky. The stack from the 2nd floor in the pic is not supported as far as I can see inside the wall coming down but the horizontal portion it is tied into has 2 U supports hung from floor joists on either side right near the connection. I may try to support the stack if I can in the wall it comes down in a chase and I removed the face not much room in there though.

    if anyone has an caution or two and plumber experience advice that I should be on the lookout for I'd sure appreciate it. I am not going to try this until I am confident
    I can indeed do it.

    Thanks!

    Attached Files:

  2. hj

    hj Moderator & Master Plumber Staff Member

    Messages:
    26,240
    Location:
    Cave Creek, Arizona
    Your drawing shows the "easy" part of the job. Now you have to decide HOW you are going to install the lav and kitchen piping properly. Of all sad words of mice and men, the saddest are these, "What a bummer! Terry said I should have called a plumber".
  3. jadnashua

    jadnashua Retired Defense Industry Engineer xxx

    Messages:
    21,802
    Location:
    New England
    Be VERY careful of cutting out CI with leaving stuff above...it is VERY heavy. It is built from the bottom up, with it all being supported like the branches of a tree. Cut out the trunk, and the top can fall, or may shift. You need to ensure it is well braced and can't move. Plus, I've heard it won't pass code with pvc underneath the CI...check on that.
Similar Threads: Plumber bust
Forum Title Date
Plumbing Forum, Professional & DIY Advice, Tips & Knocking Pipes (plumbers couldn't figure it out) Monday at 10:07 AM
Plumbing Forum, Professional & DIY Advice, Tips & Plumber coming tomorrow; my late husband used to do ALL these type repairs/remodels.. May 13, 2014
Plumbing Forum, Professional & DIY Advice, Tips & Did my plumber solder in my temperature balance anti-scald unit? Apr 18, 2014