Please comment on plumbing layout

Discussion in 'Shower & Bathtub Forum & Blog' started by edwardrroonney, Apr 1, 2009.

  1. edwardrroonney

    edwardrroonney New Member

    Joined:
    Oct 30, 2008
    All items are Kohler, thermostatic valve and control valves are 3/4". There will be 3 control valves, 1-overhead watertile, 1-wall shower, and 1-handheld shower.

    This is replacing a bathtub, I am using the Schluter kit for 32"x60" with center drain.

    Please take a look at my layout and see if it makes sense, thanks!!!!
     

    Attached Files:

    Last edited: Apr 1, 2009
  2. kingsotall

    kingsotall Plunger/TurdPuncher

    Joined:
    Aug 17, 2008
    Occupation:
    Hand copper part cleaned ready to go
    Location:
    Flagstaff, AZ Sitting on an upside down 5 gallon b
    I'm more interested in your drain layout.
     
  3. Sponsor

    Sponsor Paid Advertisement

     
Similar Threads: Please comment
Forum Title Date
Shower & Bathtub Forum & Blog Please comment: Tiling flange irregularities--Big problems ahead Jul 3, 2015
Shower & Bathtub Forum & Blog Help please with tub replacement Jan 9, 2016
Shower & Bathtub Forum & Blog Please help me find this hinge from framed shower door Jan 9, 2016
Shower & Bathtub Forum & Blog Help Identify this Auburn Brass set please :) Dec 19, 2015
Shower & Bathtub Forum & Blog Rusty Drain, New Condo, Marble Floor, Unknown Material - help please Dec 14, 2015

Share This Page