jtittlebaum
New Member
- Messages
- 1
- Reaction score
- 0
- Points
- 0
I am replacing a tub and building a walk-in shower in a pier-and-beam house. Once the old tub is removed, I plan on tiling the entire area, including the floor, for the new shower. What is the best way to prepare the floor to ensure no leakage and proper draining?