Hello. I just had my old cast iron drain system replaced with PVC. At the same time, I had the plumber rough-in for a bathroom in the basement.
I like the work he did and I believe the system looks good, and it passed inspection, but I am just looking for other opinions of his work.
Thank you,
Matt
One more thing to add: I posted these pictures because they are before the trench was backfilled to show the full pipe layout. The basement lav drain was cut at the line on the wall, a hanger was attached to the wall, and a 90 was used to bring the drain out from the wall and it was capped with a temporary cap.
Also, the 3" pipe for the basement toilet has been cut shorter and capped.
I like the work he did and I believe the system looks good, and it passed inspection, but I am just looking for other opinions of his work.
Thank you,
Matt
One more thing to add: I posted these pictures because they are before the trench was backfilled to show the full pipe layout. The basement lav drain was cut at the line on the wall, a hanger was attached to the wall, and a 90 was used to bring the drain out from the wall and it was capped with a temporary cap.
Also, the 3" pipe for the basement toilet has been cut shorter and capped.