I'm moving the basement rough-ins for the shower and toilet.
Here's the situation:
https://www.dropbox.com/s/jqlm62i2cx8y6ik/drain layout.jpg
I see 2 options: What would be my best option? Are there any other option
Option 1: I want to leave most of it as is but there's no room to cut and place a horizontal right angle elbow for the toilet drain.
I would have to cut part of the vertical right angle elbow to current toilet rough-in
Option 2: Cut the green pipe and redo all everything
I live in Markham, Ontario, Canada
Thanks!
Here's the situation:
https://www.dropbox.com/s/jqlm62i2cx8y6ik/drain layout.jpg
I see 2 options: What would be my best option? Are there any other option
Option 1: I want to leave most of it as is but there's no room to cut and place a horizontal right angle elbow for the toilet drain.
I would have to cut part of the vertical right angle elbow to current toilet rough-in
Option 2: Cut the green pipe and redo all everything
I live in Markham, Ontario, Canada
Thanks!