    Dear setters (and sympathetic others)

    I’ve been engaged in my own bathroom renovation for the past 2 months. Initially, I was going to do the tiling myself, but decided that this best be left to a master tiler. I did my research and decided to go with a company supposedly has an excellent reputation. They advertise, “all master settersâ€, guarantee satisfaction and a 3 year warranty.

    In prep for the reno I had managed to get the floor perfectly level (sistered joists, blocking, new subfloor, and plywood underlayment). I laid a heating mat in SLC. I messed the leveling up somewhat and was prepared to do a corrective pour prior to unleashing the setter. However, the owner (of the company: I’ll call him owner) said he’d prefer that I let their respective setter take care of this – I figured they would perhaps use a dry pack around the low perimeter areas, or mortar, and frankly I was happy to oblige.

    On day one, the setter and his assistant showed up and seemed unprepared for the need to level. Indeed he arrived without a level. I offered him several of mine. As you can imagine, first impressions were not great: his wet saw is a small, cheap mastercraft (Canadian Tire; http://reviews.canadiantire.ca/9045...-mastercraft-wet-tile-saw-reviews/reviews.htm) table-like saw. He also neglected to bring drop sheets or any protection for the newly installed tub, etc. etc. (perhaps the tools don’t make the master eh!). Regardless, my confidence in the project didn’t start well.

    He laid the ditra that I provided (fortunately, I had unmodified thinset, and a ditra trowel); unfortunately, he used a modified thin-set over the ditra. Later, in regards to this, the owner laughed at me, suggesting that the Ditra warranty meant nothing compared to his warranty (I hope he’s right).

    Hopefully, this is enough background info other than to say that I did express to the owner my concerns regarding the presumed “expertise†of the setter; and he did show up for an inspection. I have several questions:

    1) Setter used a ½ x 3/8? trowel and back-buttered much of each tile; but he did not appear to have compressed notches on setting – i.e. it appears that some parts of tiles are resting on the notches.

    2) I know that John W argues for near 100% thinset-tile-wall coverage. What is your standard? For instance as per my pics there are thin notch gaps running under some tile (see pics demonstrating depth) – is this acceptable?

    3) I have already had the setter redo substantial components of the tile (particularly within the niche – inspired and advised by J Whipple), but in general (superficially) how would you grade the quality of his work? For instance the long plank tile was difficult for him to rip (he believes that the jagged cuts (see pick) will be hidden at ceiling and floor by chaulking
    4) During the inspection, the owner assured me that the setter’s mortar technique looked good (he could tell by looking through the unfinished grout spaces. Regardless, he assured me that satisfaction was guaranteed and that if any issues arise I have a three-year warranty. Am I being a paranoid homeowner here (I am willing to admit this) or do you foresee adhesion issues, and when (e.g. 4 years)?

    5) Regarding the floor: it is level to bubble in the centre (at worst, there is about ¼ dip at tub. To be fair, the owner said that he’d have the tiler correct the entire floor (yet he implied that this would be unreasonable given that ¼ inches is within industry standard). Frankly, I feel for the setter – ultimately he would pay for it. I said that it would be fine as long as the toilet didn’t rock. I just checked (prior to grouting) and it rocks just a tiny bit. I know this can be shimmed – is this acceptable?


    Sorry for being long winded. Ultimately, I feel for the poor setter. He has done a good 2 1/2 days work thus far and has been compliant and relatively good natured with my requests. Frankly, I'm inclined to just have the job completed. I am more pissed with the owner: he promised a master setter. I was shocked when, in front of me, as we were going through the inspection, he provided the setter with a list of equipment that a setter should possess. He demanded that he purchase these tools prior to his next job start Monday – I thought – what about my job?

    Btw. Setter is coming by Sunday to grout.

    Hal

    Attached Files:

  2. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    More pics: the good

    Niche inspired by John W. Had him redo the grout lines.

    Attached Files:

  3. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    The Ugly??

    Gaps formed by notches Is this OK? btw - I was very careful not to damage the 1 day old thin set.

    Attached Files:

  4. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    more pics

    These were pried from the wall to fix the niche

    Attached Files:

  5. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    Illustrates depth of notch gaps:

    Attached Files:

  6. jadnashua

    jadnashua Retired Defense Industry Engineer xxx

    Messages:
    21,802
    Location:
    New England
    IMHO, far from 'master'. In reality, far from the minimum industry standards. On a floor, industry standards call for 100% of all edges, and at LEAST 80% coverage of the rest of the tile, with the goal being 100%.

    If you read the Schluter Ditra Installation Manual (you can download it from their website), the reason they recommend a dryset mortar on top of Ditra is that unless they used a rapid set mortar, with a large tile, after waiting over two months, the mortar still hadn't dried sufficiently to support the tile properly. What does that do to the overall strength? Well, the main reason why a modified is stronger than a dryset is that it encapsulates the cement crystalline spikes as they grow while curing and supports them. But, what happens if stress is applied before because they have not properly dried? The cement crystals break and lose strength. A good dryset often has more cement per volume than the modified AND cures just fine in a known, predictable timeframe. I just love it when people think they know more than the people who design, specify, and warrant their stuff.
  7. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    Hi Jim. Would you say that these edges are unsupported:

    removed tile expose edge.jpg span of gap at door.jpg unsupported edge window.jpg
  8. eurob

    eurob In the trades

    Messages:
    446
    Location:
    Montreal
    Did he prefill the ditra's waffles before the tile installation ? Some installers will stand by their work and none of mfgs warranties can accomodate you any better . What type of thin set or medium bed did he use ?

    1) The trowel is an acceptable one . How do you know if proper contact was made ? Did you pull one or see them pulling one ? He definitely had to pull some from the floor , due to the problems mentioned with the SLC.

    2) 100% coverage on every tile -- floor and walls -- is the desired goal but hardly achieved in real life . For this you need an experienced installer which , is an OCD one . Gaps or air pockets are not acceptable -- 10% (not concentrated in one spot ) or less -- .

    3) Hard to see the ceiling cuts , but if edges of the tiles are chipped , uneven gaps, a larger joint -- 1/4 or ore -- will be needed to cover them . Aesthetically this is unacceptable IMO .

    4) There are issues with bondage -- pried tiles from the wall ( poor coverage ) , did the wall got damaged in the process ? -- , gaps under the tiles -- stick probing --, etc. which you can see on the photos . Very hard to rely on warranties in today's reality with the issues at hand .

    5) Toilets are hardly perfectly flat on the bottom . Shimming -- not excessive one -- is acceptable , but plumbers do not appreciate us complicating their life by setting the tiles uneven . The 1/4 inch is a reference from floor preparation and is 1/4 in 10' ( feet ) . This is a maximum allowed , but if you want a flat and leveled floor , the reference should not apply .
    Last edited: Jan 31, 2014
  9. jadnashua

    jadnashua Retired Defense Industry Engineer xxx

    Messages:
    21,802
    Location:
    New England
    You're there, but unless the photos are lying...they sure don't look like they have thinset there!

    As I said, the standard calls for 100% of the edges, and at LEAST 80% in the field. The goal, not always attained, should be for 100% everywhere, but the industry tests are for the minimum. It also looked like the tiles that were removed did not have 100% or 80% support, but were backbuttered, which helps, but doesn't count unless it touches and bonds with the notched thinset installed underneath.
  10. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    Thanks Roberto

    Magniflex 8810

    He pulled a few - I could clearly see trowel marks on the wall - I assume this means that their must be some air gaps.

    No damage to the wall, but would 24 hours be sufficient to create a firm bond?

    This is more like 1/4 over four feet.

    Do you think that most tilers would realize or acknowledge the gapping as presented is unacceptable?

    One more thing I found: a nice chip in the tub surface. He didn't use any reasonable tub protection.

    Hal
  11. eurob

    eurob In the trades

    Messages:
    446
    Location:
    Montreal
    You are welcome .

    Not familiar with it , but I probably used it 2 or 3 times a long time ago . It is a thin set and building the floor with it is pretty painfull and not allowed unless it is a medium bed . It is also approved for the Ditra -- ANSI 118.1 -- .

    http://www.chembond.com/English/TDS/MagniFlex8810_E.pdf for future references .

    Kinda wired the TDS says not to use in wet areas ? Something to ask the installer .

    You have to check both surfaces -- back of the tile and the wall - for proper coverage . If you pull one tile and see the notches clearly and undisturbed -- same as when you applied them on the wall -- it means no contact at all with the tile was achieved . Adding more is necessary . I suppose you used Kerdi on the walls , but you know those recommendations , no build up allowed -- ok maybe a little , but not excessive --.

    24h is sufficient to damage the wall -- CBU -- or the membrane Kerdi -- debondig it -- . Probably no damage happened due to insufficient adhesive .


    Like I said , the flatness or levelness is decided -- by the parties involved -- before installation . In your case is unacceptable .

    Theory sounds great until you put in practice . Achieving the theory demands dedication and sometime '' out of your mind '' approach . Many will say yes , but until failures , pulling tiles up , hollow sounds , lippage ,etc. are present , no is coming often pretty often .

    That's very unfortunate . Please protect -- your investment -- your tub , repairs beyond a certain point are very costly . Probably in your case a repair can be achieved , call the supplier or the mfg for further assistance .
    Last edited: Jan 31, 2014
  12. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,783
    Location:
    North Vancouver, BC
    post(s) deleted by John Whipple
    Last edited: Mar 17, 2014
  13. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,783
    Location:
    North Vancouver, BC
  14. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,783
    Location:
    North Vancouver, BC
    post(s) deleted by John Whipple
    Last edited: Mar 17, 2014
  15. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    Does Canadian Tire make a MasterCraft diamond blade? I suggested - I should have insisted - that we take the tile to a marble shop for cutting. I wasn't overly concerned about cuts around the window as they will be covered by trim. btw could you rip these with a grinder?

    Thankfully, the owner has agreed to replace the tub (I counted about 7 chips/scratches and multiple scratch marks along the edge) - apparently this will come out of the setter's pay. I am hoping the company will resolve the problem - I have asked for a complete rebuild, obviously by a different setter, including ensuring that the waterproofing membrane is in tact. I spent a good deal of effort sealing up that niche. It is possible that the owner thinks that my coverage/bonding concerns are not relevant. Hopefully this tile-on-tile action might persuade him that there is a problem:


    2014-02-01 14.53.46.jpg

    2014-02-01 14.53.37.jpg

    2014-02-01 14.54.10.jpg

    2014-02-01 14.54.40.jpg
  16. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
  17. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    Would anyone care to comment on tiles set directly in contact with tub deck (at two points - one of which spans 30 inches). What sort of issues might arise (if any)?

    Hal
  18. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,783
    Location:
    North Vancouver, BC
    Master Tiler - from bad to worse

    post(s) deleted by John Whipple
    Last edited: Mar 17, 2014
  19. Natup

    Natup New Member

    Messages:
    15
    Location:
    Toronto
    Tub will be replaced, but, they would be installing new tub and surrounding tile in-line with existing grout lines (i.e. I suspect there would again be contact)
  20. johnfrwhipple

    johnfrwhipple I love these ACO Shower Drains - Best in Class

    Messages:
    3,783
    Location:
    North Vancouver, BC
    Non-Tile Masters of Toronto

    post(s) deleted by John Whipple
    Last edited: Mar 17, 2014
Similar Threads: Master Tiler
Forum Title Date
Shower & bathtub Forum & Blog Fancy master shower components & configuration Feb 13, 2014
Shower & bathtub Forum & Blog Kohler system and valves- MasterShower or RiteTemp - which should we spec? Sep 8, 2013
Shower & bathtub Forum & Blog Run dedicated 3/4" pex to master shower? May 30, 2013
Shower & bathtub Forum & Blog Building a new master shower with antique-looking exposed copper plumbing May 14, 2013
Shower & bathtub Forum & Blog 3/4 inch supply line to master bath, but 1/2 inch line at shower valve? Feb 12, 2013

Share This Page