jferello
Member
So this is a piece of my well pipe that I need to cut out to install a CSV valve. I assume the entire length of the pipe looks like this:
This pipe is from the well head, underground and into my basement; it is about 15-20' long.
We do have iron and Hydrogen Sulfide issues, but this pipe has been there for 30+ years, so not too bad.
How can I clean this? Could I dump a ton of iron out into my well and hope for the best?
Thanks,
Justin
This pipe is from the well head, underground and into my basement; it is about 15-20' long.
We do have iron and Hydrogen Sulfide issues, but this pipe has been there for 30+ years, so not too bad.
How can I clean this? Could I dump a ton of iron out into my well and hope for the best?
Thanks,
Justin