    Yikes.

    So I have begun that rewire/up-grade in the 1928 lathe and plaster house. Wired with RIGID conduit and cloth and rubber wire.

    Not EMT. Rigid. I cannot guess how hard that work was. They must have bent the conduit and threaded the ends afterward.

    The place is lousy with sconces that had switches. The customer wants to lose most of them and have switches by the door (as is the CUSTOM, if not required by code!)

    Found the conduit from the panel to the second floor. Will be pulling two 14 ga circuits with grounded (neutral? No) whites plus a 12 ga circuit for the two second floor bathroom outlets.

    Of course, the customer wants to be able to hang fans on the two bedroom ceiling boxes. Hoo boy. I get to pull out the old boxes from the lathe and plaster ceilings and fit a new box under the old rigid conduit. What fun. And another in the Mater Bath, but that is new/old work with NM.

    I am soooo ready for the heat to break. But the attic is pretty roomy, the old insulation is gone and itchy stuff has been installed. And the basement/crawl space is fairly roomy. Cannot complain. I think the customer would have accepted another thousand in the bid, but I'll make it up with the change orders.

    My oscillating saw is doing wonders with the lathe and plaster.
  2. ActionDave

    ActionDave Electrician

    Messages:
    346
    Location:
    Colorado
    If you are good enough (I'm not and never will be) you don't need to do that.
    So you took my advice and didn't even send out a shout. That's so cold I feel like I'm walking in a winter wonder land right now.
  3. Homeownerinburb

    Homeownerinburb New Member

    Messages:
    525
    Location:
    Los Angeles, CA USA
    Hey, I only just started.

    What SUCKS? Is that the two bedroom ceiling fixtures have four rigid conduits entering them each, from above. The conduit is bent 90 degrees.

    I have never seen a steel fan rated box that has four 1/2" holes on top and any legit way to support the box to the ceiling rafters.

    Meaning I need to cut some or several of the rigid conduits and transition to flex.

    And that is that many more hours in the attic.

    Well. Start early and if I'm not done by ten or eleven, come down and do some other damned thing.
Similar Threads: Houses built
Forum Title Date
Electrical Forum discussion & Blog advice on wire gauge for built in oven Nov 1, 2011
Electrical Forum discussion & Blog Built in microwave needs dedicated circuit? Aug 13, 2007
Electrical Forum discussion & Blog built in microwave outlet Jul 9, 2007

Share This Page