mhnelsoon57
New Member
Rental house build in 1977 - Had half bath in basement - Vanity and shower - Recently tore out vanity and shower - Wanted to replace vanity along with adding a toilet - Where shower stood has 2 inch high 24X24 concrete riser platform that has a 4 inch hole but only has a 2 1/2 inch sewer pipe - This pipe is cut flat with the riser - Can only see approx 12 inches below the flooring and it looks like the pipe remains the same size -
What options do I have to put a flange down to install a toilet?
What options do I have to put a flange down to install a toilet?