    Hello all, I'm a newby, I searched the FAQs but didn't find an answer to this. My plumber roughed in a toilet flange for me a while ago. I'm now to the tile stage, my question is should the flange be ssecured to the sub-floor or should it be at the same level as the finished tile. I have a layer of Ditra then the tile. If it has to sit at the tile level, how should I secure the flange to the floor? Thanks in advance, and sorry for my ignorance!

    Joe T
  2. Gary Swart

    Gary Swart In the Trades

    Messages:
    7,386
    Location:
    Yakima WA
    Don't know how you could have missed finding the answer to this one. Flanges are supposed to set on top of the finished floor (Tile in your case) and be anchored (Screwed) into the sub flooring. The method most recommended is to notch the tile when laying it rather than drilling pilot holes. Nothing wrong with drilling holes, but it's tough drilling and requires special bits. Most folks don't install the flange until the tile is laid. Might be worth having the plumber redo this.
  3. JoeT

    JoeT New Member

    Messages:
    14
    Location:
    Scranton Pa.
    Thanks Gary, The plumber left me enough flexibility to set the flange on top of the tile.
Similar Threads: Flange tiling
Forum Title Date
Toilet Forum discussions Toilet Flange Rough-in Before Tiling Jan 23, 2009
Toilet Forum discussions Toilet flange and tiling questions Jan 23, 2006
Toilet Forum discussions Toilet flange repair option Saturday at 2:17 PM
Toilet Forum discussions Toilet Flange too High Nov 7, 2014
Toilet Forum discussions Using a repair ring without a flange? Sep 11, 2014

Share This Page