cheetah chrome
New Member
Hi,
First off not a pro, read this forum extensively regarding the job at hand and it has gone perfect...so thanks to all. Ok, I set an acrylic jacuzzi tub yesterday in a mortar bed and then banked the perimeter w the exception of a small section so I could inspect the drain for leaks. Ran a couple of leak tests and none found. I am going to mix up another batch of mortar to finish up the small section but wanted to ask if what I have banked so far is enough. Bank is approximately 5"s up from the floor.
First off not a pro, read this forum extensively regarding the job at hand and it has gone perfect...so thanks to all. Ok, I set an acrylic jacuzzi tub yesterday in a mortar bed and then banked the perimeter w the exception of a small section so I could inspect the drain for leaks. Ran a couple of leak tests and none found. I am going to mix up another batch of mortar to finish up the small section but wanted to ask if what I have banked so far is enough. Bank is approximately 5"s up from the floor.
Last edited: