I am building a garage separate from my house,I am including a bathroom,and am giving it it's own septic system.
Garage will have 3 fixtures,toilet,lav,and shower.Slab on grade construction.The toilet will be very close to where the sewer line enters the building,the shower and lav are to be on an opposite wall,7 feet away,also an exterior wall.
My question is,what is the most simple way to vent and provide cleanouts?Although it is slab on grade it will have an 8" high,8" wide concrete "foundation wall" above the slab,and I would like to plan not only the DWV layout,but also any pipes that need to be embedded within this short foundation wall.
I am building a garage separate from my house,I am including a bathroom,and am giving it it's own septic system.
Garage will have 3 fixtures,toilet,lav,and shower.Slab on grade construction.The toilet will be very close to where the sewer line enters the building,the shower and lav are to be on an opposite wall,7 feet away,also an exterior wall.
My question is,what is the most simple way to vent and provide cleanouts?Although it is slab on grade it will have an 8" high,8" wide concrete "foundation wall" above the slab,and I would like to plan not only the DWV layout,but also any pipes that need to be embedded within this short foundation wall.