Hi guys and gals.
I am finishing my downstairs bathroom and am in need of some advice. The builder had already installed the toilet and installed the drain trap under the concrete for the future shower. My problem is that the drain pipe and the tub drain don't line up. Should I try to raise the tub and run a drain pipe over to the drain? Or, dig out the concrete and run the pipe over? Thanks in advance for any ideas!
I am finishing my downstairs bathroom and am in need of some advice. The builder had already installed the toilet and installed the drain trap under the concrete for the future shower. My problem is that the drain pipe and the tub drain don't line up. Should I try to raise the tub and run a drain pipe over to the drain? Or, dig out the concrete and run the pipe over? Thanks in advance for any ideas!