Hi, all. I'm in the process of planning a bathroom for my basement. The current stack is in the slab, but there is no rough-in. Can you all check my initial thoughts on drain and venting and make sure I'm headed the right direction. It's a pretty basic 5'x8' layout with one wet wall and a stub for a bar sink on the back side facing into the adjacent room.
I didn't indicate the diameters of the pipes or fittings. I'm trying to focus on putting the right types in the right places now, with sizes specified as I go on.
Please let me know if you think I'm on the right track. Of specific interest if if I have adequate venting for the tub and toilet locations and can I have a vent "upstream" from the toilet or does that make the run a "wet vent"?
Thanks.
Dan
I didn't indicate the diameters of the pipes or fittings. I'm trying to focus on putting the right types in the right places now, with sizes specified as I go on.
Please let me know if you think I'm on the right track. Of specific interest if if I have adequate venting for the tub and toilet locations and can I have a vent "upstream" from the toilet or does that make the run a "wet vent"?
Dan