Finishing up plumbing in slab on grade bathroom. Trying to figure out if it is ok to drain vanity into 3" pipe which is ran at a 45 down to horizontal combo end. Seems as though drawings always bring in drain after toilet entry. Was hoping to get by wet venting this way, but I could also separate vent toilet and tie together in ceiling. Sorry if drawings are not up to par and thanks for any help.
Last edited by a moderator: