    Our builder roughed in "full" bathroom plumbing (toilet, sink, shower and wetbar sink)when we built our house. Now we are ready to finish off the basement and I have a few questions please...

    All the basement roughin plumbing has been run to an ejector pit.

    1. We have decided that we don't need a shower in the basement. Can the shower drain roughin pipe be cut off and capped just below the floor level? (I know this is probably a very basic question, but I just want to make sure)

    2. Our builder had the foresight to run two 2" ABS vents that run all the way out the roof and are just "capped" in the basement for this future use.

    Should the ejector pit pump be run to one of these vents and the additional vent be used to tie all the other vents for each fixture (sink, wetbar, sink)?

    Sorry for the "newbie" questions...
     
  2. hj

    hj Moderator & Master Plumber Staff Member

    Joined:
    Aug 31, 2004
    Occupation:
    Plumber
    Location:
    Cave Creek, Arizona
    questions

    From your description, the answer to all three questions would be "yes".
     
  3. Sponsor

    Sponsor Paid Advertisement

     
Similar Threads: Basement plumbing
Forum Title Date
Plumbing Forum, Professional & DIY Advice Will this basement bathroom pass plumbing inspection? May 29, 2015
Plumbing Forum, Professional & DIY Advice Basement plumbing draft Apr 15, 2015
Plumbing Forum, Professional & DIY Advice Help with basement bathroom plumbing Apr 7, 2015
Plumbing Forum, Professional & DIY Advice Help in validating plumbing configuration for a basement bathroom Apr 4, 2015
Plumbing Forum, Professional & DIY Advice Basement Bathroom with Ejector - Is existing plumbing to code? Oct 10, 2014

Share This Page