Hello, I'm in the middle of a renovation on a 1950's house and have moved my attention to finishing the basement. I plan on adding a bathroom and have dug the hole for the sewage ejector but wanted some advice when it came to the actual plumbing.
We will be adding a 48" vanity, toilet, and 42x42" shower. The room will also double as the laundry room.
I've attached a photo of the layout and my rough drawing of my plumbing plan. Please excuse the crudeness of the drawing. As you can see not everything is lined up as I plan to have it when breaking of the concrete begins.
The vent near the sink/toilet services the kitchen sink on the main level but is not wet, and the vent near the main stack joins the main stack in the attic.
I'm in Montana if that makes a difference as far as codes go.
Thank you for taking the time to look.
We will be adding a 48" vanity, toilet, and 42x42" shower. The room will also double as the laundry room.
I've attached a photo of the layout and my rough drawing of my plumbing plan. Please excuse the crudeness of the drawing. As you can see not everything is lined up as I plan to have it when breaking of the concrete begins.
The vent near the sink/toilet services the kitchen sink on the main level but is not wet, and the vent near the main stack joins the main stack in the attic.
I'm in Montana if that makes a difference as far as codes go.
Thank you for taking the time to look.