I am finishing my basement, and will be installing a two or three piece tub / shower. My basement has been roughed in. There is a 2 inch pipe sticking out of the cement floor for the tub drain. Should there be a morter patch that I need to chip out in order to properly install the drain and overflow?
Also, do I need to install aqua board behind the tub and shower, or can the 3 piece shower simply be attached directly to the studs?
thanks
Also, do I need to install aqua board behind the tub and shower, or can the 3 piece shower simply be attached directly to the studs?
thanks