donlawson84
New Member
Hello, I am going to be cutting up the basement floor and installing a crock / sewage pump. I am trying to lay out the shower, toilet and sink first. With all three going to the crock, I am aware the basin will be vented; will each drain need to be vented? Is there a code on over X distance, vents will be needed? any codes on my situation will be helpful
Thanks
Thanks