Jon Lorusso
New Member
My house was built in 1811. The 2nd floor subflooring is the kitchen ceiling. Currently there are unsightly (unsoundly?) toilet and shower drains routed directly over the kitchen table.
My plan is to use a backflush (read drain) toilet and a "step-up" shower to move the drain pipes above the subflooring. I've got about 12' to traverse for the shower drain.
What would you recommend for the height of the step-up into the shower?
Have you ever used a "shallow p-trap" or a HepVo "waterless" trap?
Thanks!
My plan is to use a backflush (read drain) toilet and a "step-up" shower to move the drain pipes above the subflooring. I've got about 12' to traverse for the shower drain.
What would you recommend for the height of the step-up into the shower?
Have you ever used a "shallow p-trap" or a HepVo "waterless" trap?
Thanks!