I had a plumber put the floor pipes in for a basement bathroom.
The drain for the toilet is roughed in at 18 inches from the back wall. I was planning on using an Eljer aqua-save which has a 12 inch rough-in suggested. Did the plumber just screw me on this? I have never seen 6-7 inches between the tank and the wall.
Now that the cement is down, what should I do with that extra space back there? Any suggestions so it doesn't look like crap?
Thanks in advance for 'feedback'...
chris
The drain for the toilet is roughed in at 18 inches from the back wall. I was planning on using an Eljer aqua-save which has a 12 inch rough-in suggested. Did the plumber just screw me on this? I have never seen 6-7 inches between the tank and the wall.
Now that the cement is down, what should I do with that extra space back there? Any suggestions so it doesn't look like crap?
Thanks in advance for 'feedback'...
chris