Search results

  1. S

    2012 UPC + Cleanouts

    I'm in Seattle, which adopted 2012 UPC. My drain/waste lines for bathroom are on horizontal branches from the main stack. I have less than 135-degrees of bends, but the toilet terminates a total of about 7' from the main stack, and the tub more than 5' where it branches from toilet drain line...
Top