Search results

  1. J

    Rough-in for concrete over PVC DWV

    What is standard practice at the rough-in stage for PVC DWV piping that penetrates a slab floor? In particular, how are vents and drains terminated in (or above or below) the slab before the concrete work is done? Are all drains/vents brought through the slab and left projecting above the...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks