Search results

  1. westminster

    Please Review Our Plan for Kitchen/Half-Bath Rough-In

    Hi. We are renovating our kitchen and adding an adjacent half-bath. This is our very first plumbing project, and we wanted to run our DWV rough-in by you experts to get your input. Here is a drawing of our current plan: http://freepdfhosting.com/08990ebc90.pdf The picture shows the back...
  2. westminster

    boring holes in studs without right angle drill

    Hi. We are doing a DIY kitchen/half bath renovation. We have been planning the DWV routes to try and avoid drilling through studs as much as possible, but it looks like we will need to bore holes in at least about 3 studs - one will be to accommodate 2" PVC and the others will be to...
  3. westminster

    demoing a bathroom

    Hi. We are ripping out a full bathroom on the first floor of our home, which will become part of our kitchen and will eventually contain a new sink and d/w. We are also planning to put a new half-bath in an adjacent closet. We will hire a plumber to rough out the new plumbing. However, my...
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks