JAMS
New Member
I'm trying to work a waste line around a beam/joists and my current solution: toilet (3" line), then shower (2"), then vent (2"). I can change the order to: toilet, vent, shower. Will either work with the IPC?
The vent goes vertical right after the wye and if needed, I may be able to make the vent line 3".
The vent goes vertical right after the wye and if needed, I may be able to make the vent line 3".