I have a ProPex no lead 3/4" brass fitting that I'd like to solder to no lead 3/4" cast copper elbow.
Both of these pieces are heavy guage and I'm wondering if I'm just asking for trouble.
Would I be better off with a piece of copper pipe in between?
Thanks!
Both of these pieces are heavy guage and I'm wondering if I'm just asking for trouble.
Would I be better off with a piece of copper pipe in between?
Thanks!