dix
New Member
I need to raise the p-trap in the sink drain 3-4 inches, some googling has found articles suggesting that height increase should be in the current vertical and then run horizontal from that vertical to the proper height before coming out of the wall (yellow line in the diagram). Other suggestions are just to 90 from the current horizontal, going vertical to the correct height needed before coming out of the wall (green line); or to 90 sooner in the horizontal run then go vertical to the right height befrore going horizontal to the point where it comes out of the wall (red line). Not sure what is the correct way. Both the red and green line would maintain the current horizontal after the new 90.
Note - black line represents the current vertical which is actually further in the wall, but just shown at that location to fit in the picture.
P.s. I am in Ontario, Canada if that changes anything.
Note - black line represents the current vertical which is actually further in the wall, but just shown at that location to fit in the picture.
P.s. I am in Ontario, Canada if that changes anything.
Last edited by a moderator: