Cruiser
Member
Hello all,
I'm in the planning stages for a new double shower and am currently thinking water supply. It's a ranch style with concrete slab. The nearest current stub outs are 16 feet away (8' across the loft and 8' down the wall). There are 3/4" stubs and 1/2" stubs available to me at pretty much the same location
Should I pull 3/4" as near to the control valve as possible and then reduce to 1/2" or just take the 1/2" from the stub and run it all the way?
Thanks for your time
I'm in the planning stages for a new double shower and am currently thinking water supply. It's a ranch style with concrete slab. The nearest current stub outs are 16 feet away (8' across the loft and 8' down the wall). There are 3/4" stubs and 1/2" stubs available to me at pretty much the same location
Should I pull 3/4" as near to the control valve as possible and then reduce to 1/2" or just take the 1/2" from the stub and run it all the way?
Thanks for your time