Dont people still include connecting the tub/shower with the rough in plumbing ? The inspector was here one day and I told him I was about finished with plumbing rough in except connection the tubs and few more things, He said i couldnt set the tubs because he had to inspect the insulation behind the tub/showers on the exterior wall before I could put them in place. I couldnt think how to answer that for a minute and he moved on to something else.. I dont know how he is going to do that with out making a special trip to see if the insulation is there . I still have to rough the hvac and electrical before I can insulate. What am I suppose to do , insulate behind the tub/shower and call him to come look so I can set the tub and finish the plumbing rough in ?
Last edited: