Vinniejt76
New Member
I moved my rough-in in my basement about 10 feet. I've already rerun the new pvc and I'm about to pour the new concrete back into the trench I dug. Are there any things I should consider before pouring? I'm going to use cardboard around the toilet drain to create the space needed for the flange to fit. Can the concrete be poured right around the new drains? Do I need to replace the vapor barrier? Should I put gravel back into the holes here the drain isnt? should I replaced the wire that I cut out ( the trench is about 12 in wide)? Is there a specific type of concrete I should use? And finally,should the concrete be poured all at once?